Posts

Showing posts with the label Hornby Footbridge

No.39 Remediating Resin Structures – Notably Hornby Skaledale and Bachmann Scenecraft

Image
The starting point for this Blog entry is the Bachmann Coaling Stage: This was bought in full knowledge that the steps were in pieces and would need sticking back together.   I used ‘Super Glue’.   A couple of the joins are still visible but not in my opinion sufficiently obvious as to need immediate repainting. What was more obvious was the twisted and warped loading chute.   This had to be fixed! The chute is separated from the rest of the loading stage by pushing out the ‘hinge pin’.   At this point I am indebted to a contributor on RMweb for pointing out that Skaledale Resin walls can apparently be moulded to shape using hot water.   Perhaps I could use ‘hot water’ to remould the chute?    I put the chute into a small plastic bowl of very hot water.   After allowing it to soak up some heat it began to feel much like a lump of hard rubber, such as a pencil eraser.   At this point I was able to gently mould and s...

No.31 Platform Update

Image
The gales and hailstones continue so luckily no gardening.   There has been plenty of time to progress the platform paving. My previous layouts were made from chipboard and I used the off cuts to form the platform bases which were then surfaced with 3mm plywood. The current layout is built with ½ inch MDF and again the off cuts have been utilised for the platform bases.   This time I chose to use 5mm balsa wood for the surfacing.   This gives me a top of rail to platform surface height of 12mm for my code 100 Peco Streamline track.   The balsa surface is held in place with counter sunk steel pins, whilst the platform sides are covered with brick or stone paper. As a teenager I can remember being very impressed by a railway modeller who had scribed individual paving stones.   The whole platform was given a uniform colour wash and then individual paving stones were picked out with different tones. Life is very short and I do ...

No.5 Cutting Down to Size

Image
The 'ballast' has crossed the viaduct and arrived at the junction: The 'branch' is ex GWR but the 'junction' provides a connection to the the old LMR.   The foot bridge is the ubiquitous Hornby model cut down for platform use:   A view from the main line, the engine shed will have wait for another day!