No.42 After the poppy seeds

Image
I feel this entry might be slightly disjointed.   It is potentially a huge subject and it is a case of not knowing where best to start.   I did think of using the title “What’s black and white and read all over?” Hornby Scenics Medium Black and Medium Light Grey gravels mixed + Maroon (not Red) Morris Minor Traveller Ballasting all the visible trackwork with Blue Poppy Seeds is becoming just a distant memory and it is time to stop making excuses and get on with some more scenery. Hornby Scenics Fine Grey gravel with a sprinkling of Gaugemaster Coal I did make a start with the coal yard and found that I could make an acceptable surfacing by mixing Scenics fine gravel with wall paper paste spread using a stainless steel spatula. I used the same technique for the road over bridge The hardboard lift out section of road was surfaced with mix of Scenics fine grey gravel mixed into a paste with wall paper adhesive and trowelled into...

No.18 The Corner - Ballasted

Image
The last Blog entry dealt with adding the electrics for the new siding.   With the electrics completed.   I have returned to ballasting and have now completed the 'corner': It is a start and having added the ballast it highlights just how much more scenic work needs to be done. The picture below is an update of the earlier unballasted view.   The poppy seeds form a relatively thick layer and hide the cast metal base of the old Tri-ang water column. Finally another view of the station from the uphill approach.   The coaching stock on the right is 'parked' at the top of the reversing loop.   I need to make a removable cover to hide this - I have in mind retaining walls with banks and fields on top!!!

No.15 Four Bags Down

Image
When I started this Blog I made a back of envelope calculation based on a test length of 150mm which indicated a requirement for circa 3.5 kg of ballast. Four 1kg bags of poppy seeds were purchased. and I set off ballasting.   Now some four months later all four bags have been used up and the work is not yet complete.   Not a bad calculation given that I have increased the spread of ballast for parallel sidings and some open spaces around goods and engine sheds.   My back of envelope calculation also suggested that the work might take six months.   That seems still a possibility. The first views  shows the south end of the main station with Peco Inspection Pits for the 'new' diesels The second view shows the carriage sidings awaiting ballasting with a row of Skaledale houses waiting to be elevated onto a retaining wall which hopefully will hide the entry to the reversing loop. Two more views of 'progress',   below showing the south e...

No.13 A stretch in time

Image
This week has been dominated by the removal of our oil fired central heating - so not much railway modelling. The single track junction is now ballasted: I think the track was laid before the rest of the layout was completed and access to the ends of the sidings now requires great physical stamina and not a little patience!   Hence the Blog title 'A stretch in time!.   As usual I have provided card bases for the Goods Shed and Engine Shed: A picture with work in progress and then another showing the buildings in position.   There is a coaling facility planned for the siding to the right of the engine shed but that will have to wait for another day (year) The junction is supposed to represent somewhere in mid Wales where a single track   ex GWR line meets up with another single track ex LNWR line.   This allows the use of a range of Bachmann / Mainline BR (WR and LMR) rolling stock:

No.9 The Bridge in the Middle

Image
No heat wave here in the west of Scotland.    In the meantime ballasting has passed under 'the bridge in the middle'. Two pictures looking up and down the line. And a more general view which highlights where some of the 'civil engineering' works have still to be finished off. The bridge itself lifts off to allow access to the tracks beneath. I have added a picture from the past to show how plans change.   The diamond crossing with 'insulfrogs' was replaced with a single slip with a switched frog for infintely smoother running.   Also a loco spur was provided at the end of the goods sidings to hold spare engines. A good example of where allowing time to reflect (play trains) highlights where improvements can be made to the track layout prior to casting everything in stone i.e.ballasting!

No.8 The Superquick Engine Shed

Image
Not so much ballasting more a bit of history: My old Superquick engine shed in its latest position - a rare picture with no engines. The shed dates back to the early 1980s and my Bracken Ridge Layout.   It was part of a pair of sheds which were customised to fit my track spacing.   The sheds were made narrower.   This was achieved by separating the gable ends from the walls.   If you look carefully you can see where the brick arch from across the entrance was separated from the rest of the gable wall to enable the new narrower gable to be lowered back onto the side walls. Another scanned image from the past with Airfix Castles, a Lima Crab and some Mainline ex GWR and LMR types.   There is also a Hornby Dublo 8F which lives on with handrails and tender 'borrowed' from an old Mainline 'Scot'. The Bracken Ridge layout was never completed (as with so many layouts) and everything was packed away and moved   to Park...

No.7 The loco yard

Image
The ballast has reached the loco yard:   Where there are to be buildings I have glued a piece of cardboard down to the board prior to ballasting.   The cardboard is cut ever so slightly smaller than the building footprint so that it doesn't show beneath the finished building.   I also took the opportunity to make a 'concrete' floor for the engine sheds. Here is the footprint for the old Superquick shed: And here the footprint for the Skaledale Shed: And then the finished product:

No.6 2kg Down

Image
There has been lots of rain so there has been lots of progress with the ballasting: Here the ballast has reached the main station.   'Upstairs' ballasting has progressed in both directions, towards the branch terminus:   - and some more at the junction: A back breaking task reaching across the layout.   The second 1 kg bag of seed has now been used.   Must be approaching half of the visible trackwork.  

No.5 Cutting Down to Size

Image
The 'ballast' has crossed the viaduct and arrived at the junction: The 'branch' is ex GWR but the 'junction' provides a connection to the the old LMR.   The foot bridge is the ubiquitous Hornby model cut down for platform use:   A view from the main line, the engine shed will have wait for another day!  

No.4 Diamond Crossing or Single Slip

Image
P rogress with the ballast on the mainline: As originally constructed the exit from the goods yard / station was a simple diamond crossing with dead frogs: This was then changed for a single slip.   The switched frogs give excellent running characteristics.   However the rather abrupt 'turn left' is too tight for some engine / tender combinations and is in restricted use.   The change from 'diamond' to 'single slip' required the insertion of a new 'pink button' on the control panel to operate the 'turn left' solenoids.   The original 'straight across mode' being catered for by the existing buttons:   Now a close up of the newly ballasted crossing:

No.3 Fix and Patch - more on maw seed ballasting

Image
Mixing and pasting track ballast loomed large and I am attaching details of the procedure that works for me.   I prefer the small poppy seeds to gritty mineral sands.   I use wallpaper paste as the adhesive.   It should offer less resistance than PVA should there be a change of plan or track repairs needed. I use simple tools, a small plastic bowl (ex Christmas Pudding basin), stainless steel spatula and a small screw driver: I use a heavy duty wallpaper paste which has been chopped finer using the Kenwood liquidiser in the kitchen.   Hopefully the finer powder mixes more quickly and easily.   To make sure that the mix can be used well before it starts setting I only make a small batch at a time.   I use around 8ml of water (1/2 a tablespoon): I add sufficient dry paste powder to make a stiff mix (around half a teaspoon full): I then stir in sufficient dry seeds to make a stiff porridge.   In this example, just ove...