No.6 2kg Down

There has been lots of rain so there has been lots of progress with the ballasting:



Here the ballast has reached the main station.  'Upstairs' ballasting has progressed in both directions, towards the branch terminus:



 - and some more at the junction:



A back breaking task reaching across the layout.  The second 1 kg bag of seed has now been used.  Must be approaching half of the visible trackwork. 

Comments

Popular posts from this blog

No.123 Chocolate and Cream and BR1s – the Replica Railways Restaurant Buffet

No.98 The Peco Streamline 3 Way Point.

No. 163 Hornby’s new A2/2 and A2/3