No.13 A stretch in time
This week has been dominated by the removal of our oil fired central heating - so not much railway modelling. The single track junction is now ballasted:
I think the track was laid before the rest of the layout was
completed and access to the ends of the sidings now requires great physical
stamina and not a little patience! Hence
the Blog title 'A stretch in time!. As
usual I have provided card bases for the Goods Shed and Engine Shed:
A picture with work in progress and then another showing the
buildings in position. There is a
coaling facility planned for the siding to the right of the engine shed but
that will have to wait for another day (year)
The junction is supposed to represent somewhere in mid Wales
where a single track ex GWR line meets
up with another single track ex LNWR line.
This allows the use of a range of Bachmann / Mainline BR (WR and LMR)
rolling stock:
Comments