No.13 A stretch in time

This week has been dominated by the removal of our oil fired central heating - so not much railway modelling. The single track junction is now ballasted:




I think the track was laid before the rest of the layout was completed and access to the ends of the sidings now requires great physical stamina and not a little patience!  Hence the Blog title 'A stretch in time!.  As usual I have provided card bases for the Goods Shed and Engine Shed:




A picture with work in progress and then another showing the buildings in position.  There is a coaling facility planned for the siding to the right of the engine shed but that will have to wait for another day (year)



The junction is supposed to represent somewhere in mid Wales where a single track  ex GWR line meets up with another single track ex LNWR line.  This allows the use of a range of Bachmann / Mainline BR (WR and LMR) rolling stock:


Comments

Popular posts from this blog

No.123 Chocolate and Cream and BR1s – the Replica Railways Restaurant Buffet

No.98 The Peco Streamline 3 Way Point.

No. 152 Remotoring a Hornby Q6