No.18 The Corner - Ballasted

The last Blog entry dealt with adding the electrics for the new siding.  With the electrics completed.  I have returned to ballasting and have now completed the 'corner':


It is a start and having added the ballast it highlights just how much more scenic work needs to be done.



The picture below is an update of the earlier unballasted view.  The poppy seeds form a relatively thick layer and hide the cast metal base of the old Tri-ang water column.

Finally another view of the station from the uphill approach.  The coaching stock on the right is 'parked' at the top of the reversing loop.  I need to make a removable cover to hide this - I have in mind retaining walls with banks and fields on top!!!


Comments

Popular posts from this blog

No.123 Chocolate and Cream and BR1s – the Replica Railways Restaurant Buffet

No. 163 Hornby’s new A2/2 and A2/3

No. 166 A tale of two Hornby Super Detail ‘Britannias’, plus a Clan (Postscript)